The JENZ Hackthor in the VR trainer's forest scene, built from JENZ CAD

JENZ Hackthor · VR operator trainer

Mid-project review

What we promised, what we delivered, and what JENZ can do with the twin from here.

Nova Media · Joe Mecca · November 2026

Invoices, deliverables and running totals

Every payment and what it delivered

Dec 2025

€2,500

20243137JNZ3611

Received 29 Dec

Starter module

€2,500
4 deliverables

Jun 2026

€2,900

INV0182

Received 12 Jun

STP integration

€5,400
5 deliverables

Jul 2026

€2,900

INV0123

Received 27 Jul

Controllers

€8,300
7 deliverables

Aug 2026

€3,750

INV0142

Received 27 Aug

Movements

€12,050
8 deliverables

Sep 2026

€3,750

INV-JENZ-0143

Received 21 Sep

Model split

€15,800
9 deliverables

Oct 2026

€3,750

INV0144

Received 20 Oct

CAD pipeline

15 Oct

Web 3D pilot

28 Oct

CAD Workbench

€19,550
14 deliverables

€19,550 paid · 6 of 6 invoices settled · 14 deliverables

From November: €3,750 a month to July 2027 · €33,750 to go

Timeline of events

Contracts, files, controllers and payments

12 Nov 2025

Meeting

First visit at JENZ in Hannover Agrotechnica

19 Dec 2025

Agreement

Starter module signed and invoiced, €2,500

29 Dec 2025

Payment

€2,500 received

13 Jan 2026

Meeting

Project start call; CAD formats agreed

18 Mar 2026

Delivery

Controls prototype sent; joysticks requested

31 Mar 2026

Hardware

VR headset arrives at JENZ

15 Apr 2026

Delivery

Phase 1 delivered: core app with physics

28 May 2026

Agreement

June and July phases agreed, €5,800

12 Jun 2026

Payment

€2,900 received (INV0182)

Late Jun 2026

Files

Processed STP files from JENZ

1 Jul 2026

Hardware

Joysticks leave JENZ by DHL

27 Jul 2026

Payment

€2,900 received (INV0123)

31 Jul 2026

Hardware

Joysticks reach Bologna after a DHL address loop

6 Aug 2026

Hardware

Right joystick dead: loose red wire; left one works

13 Aug 2026

Meeting

Review meeting; status video and costs

27 Aug 2026

Payment

€3,750 received (INV0142)

21 Sep 2026

Payment

€3,750 received (INV-JENZ-0143), paid by JENZ 17 Sep

29 Sep 2026

Agreement

€3,750 a month agreed; September delivery sent

20 Oct 2026

Payment

€3,750 received (INV0144)

30 Oct 2026

Files

JENZ movement figures; movement review

5 Nov 2026

Meeting

Mid-project review

Status · November 2026

Halfway through the programme, delivered month by month as agreed.

The Hackthor with its crane in the forest scene of the current build

Done · Dec–Jul

Cab, scene, crane

VR driver seat, cab from JENZ STP files, forest landing, crane moving from the sticks.

Watch the video

The crane rigged on its real hinge axes in the CAD Workbench

Done · Sept–Oct

CAD pipeline

Model split for animation; STEP files to a crane rigged on real axes; web 3D pilot.

Watch the video

Chipper assemblies separated and coloured by movement, now being rigged

In build · Nov

Chipper and controls

Chipper movements on JENZ’s 30 October figures; physical joystick integration.

View the renders

Concept of the planned lesson start screen

Planned · Nov–Dec

Lessons and delivery

Step-by-step lessons, guidance, points, saving; Quest tuning, QA, packaging.

Watch the concept

What runs in the simulator today

Current build

Forest landing with the Hackthor, log pile and chip container

Forest landing. Machine, log pile, chip container and work zone.

Inside the cab: joystick, hard hat and checklist

Cab. Operator seat with joystick, hard hat and checklist.

Log pile of mixed lengths

Log pile. Mixed lengths for grip and feed practice.

Promised vs delivered

Every line of the original proposal, and where it stands

We proposedStatusWhere it stands
1:1 cab twin, real seatingDoneVR driver seat; cab built from JENZ STP files
Forest environmentDoneLanding with log pile, chip container and forest road
Machine movementsIn buildCrane rigged on real axes; chipper movements now, on JENZ data
Real joystick mappingIn buildStick logic done; controller arrived faulty in August
Log handling physicsStartedCrane grips and lifts logs; full physics next
Tutorials, guidance, scoringPlannedLesson flow, points and saving: November–December
Analytics exportPlannedComes with session saving
Quest APK, Windows buildPartlyWindows prototype builds shared; Quest tuning in December
Manual and videoPartlyCrane operation video ready; manual and media at packaging

Sources: JENZ VR training proposal v2; Nova project status 11 Aug 2026; CAD Workbench log 2 Nov 2026

Beyond the proposal

What came on top, at no change to scope

CAD pipeline ▸

JENZ STEP files become a rig with real hinge axes, inside Unity. 114 automated tests.

New CAD revisions

Every edit is recorded, so a changed machine re-rigs by replay, not by hand.

Chipper separation ▸

Grapple, infeed, rollers, drum, blower and splitter separated and mapped to their axes.

Movement review page

Every movement shown for JENZ to check before building; reviewed together on 30 October.

Crane video ▸

A 2-minute video of the crane working in the forest scene, usable now on PC, not in VR.

Web 3D pilot

JENZ’s truck CAD running in a browser on desktop, tablet, phone and headset (October).

The real asset

The trainer is one use. The twin behind it is the asset.

The crane is rigged on its real axes, and every chipper assembly is separated and mapped: grapple, infeed, roller, drum, blower, splitter. Built once, it can drive a web page, a parts catalogue, a fair game, a service view and social posts.

Same part keys everywhere · a new CAD revision re-rigs by replay

The Hackthor chipper CAD with each moving assembly in its own colour: grapple, infeed, rollers, blower, splitter

One twin, five jobs

Who at JENZ uses it, and for what

Product page prototype at the Skyview chapter

Marketing, web

Product page animation

The Hackthor moves on jenz.de; Skyview and reach shown, not described.

Parts finder prototype with the drum selected

Dealers, after-sales

3D parts finder

Click the part, get the right number; fewer wrong orders and calls.

Fair feed challenge prototype with log pile and touch controls

Fair team, sales

Fair feed challenge

A queue at the stand and qualified leads with consent.

Service twin prototype with fleet list and fault card

Service, product

Service twin

JENZ Telematics faults shown on the part, with fix steps.

Social kit prototype with three post mockups

Marketing

Social kit

Weekly posts in DE and EN without shoots or a machine on site.

Week by week · 1 of 3 · proposed, July 2027 path

November to January: the full machine

WEEK

MONDAY

WORK

MILESTONE

INVOICE

W45

2 Nov

Crane on the real CAD axes; 5 Nov mid-project review

Review

Invoice Nov €3,750

W46

9 Nov

Crane on confirmed limits: slew 385°, two-stage telescope, link and rotator

W47

16 Nov

Chipper joints: infeed, upper roller, drum, blower, splitter

W48

23 Nov

On site at JENZ 23–27 Nov: film the machine, compare with the sim

On site

W49

30 Nov

Right joystick repaired; all sticks, buttons and rockers mapped

Invoice Dec €3,750

W50

7 Dec

Infeed and drum behaviour: speed, reverse, overload, chip length; cab screen

W51

14 Dec

Full machine on the physical joysticks

Build

W52

21 Dec

Holiday break

W53

28 Dec

Holiday break

W01

4 Jan

Log physics: grip, slip and weight

Invoice Jan €3,750

W02

11 Jan

Rollers pulling the log; contact with cab and ground

W03

18 Jan

Lesson framework: step detection and guidance in view

W04

25 Jan

Module 1: orientation and calibration

Build

Week by week · 2 of 3 · proposed, July 2027 path

February to April: the five lessons

WEEK

MONDAY

WORK

MILESTONE

INVOICE

W05

1 Feb

Module 2: chipping basics, steps 1–6

Invoice Feb €3,750

W06

8 Feb

Module 2: chipping basics, steps 7–12

W07

15 Feb

Chipping procedure reviewed with JENZ trainers

Review

W08

22 Feb

Module 3: stacking

Build

W09

1 Mar

Module 4: safety, foreign objects in the log

Invoice Mar €3,750

W10

8 Mar

Safety: crane contact, holding a log while the rollers pull

W11

15 Mar

Points and penalties to JENZ rules

W12

22 Mar

Module 5: timed assessment and scorecard

W13

29 Mar

All five modules

Build

W14

5 Apr

Saving runs; CSV and JSON export

Invoice Apr €3,750

W15

12 Apr

Replay and instructor view

W16

19 Apr

German texts and voice prompts

W17

26 Apr

Fixes from JENZ feedback

Build

Week by week · 3 of 3 · proposed, July 2027 path

May to July: headset, trial and handover

WEEK

MONDAY

WORK

MILESTONE

INVOICE

W18

3 May

Meta Quest performance, 90 Hz target

Invoice May €3,750

W19

10 May

Comfort checks for first-time users

W20

17 May

Windows and Quest builds, QA pass

W21

24 May

Trial with JENZ trainees

Trial

W22

31 May

Fixes from the trial

W23

7 Jun

Operator manual

Invoice Jun €3,750

W24

14 Jun

Quick-start videos, English and German

W25

21 Jun

Release candidate

Build

W26

28 Jun

JENZ acceptance test

Acceptance

W27

5 Jul

Acceptance fixes

Invoice Jul €3,750

W28

12 Jul

Licence and packaging: builds without watermark

W29

19 Jul

Handover: trainer session at JENZ

Handover

W30

26 Jul

Project close

Close

Forest road in the trainer scene

Built once. Used everywhere.